EasyManua.ls Logo

Hitachi CH-UNIT - Safety and CONTROL DEVICE SETTING

Hitachi CH-UNIT
23 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...


7. TEST RUN
NOTE:
Test run should be performed according to “Installation & Operation Manual” of Outdoor unit.
Refrigerant piping and connecting wires should be connected to the same refrigerant cycle system.
If they are connected to the dissimilar refrigerant cycle systems, a malfunction may occur.
WARNING:
Do not operate the system until all the check points have been cleared.





Pay attention to the following items while the system is running.



8. SAFETY AND CONTROL DEVICE SETTING

Model CH-6.0N1, CH-10.0N1


