7. TEST RUN
NOTE:
Test run should be performed according to “Installation & Operation Manual” of Outdoor unit.
Refrigerant piping and connecting wires should be connected to the same refrigerant cycle system.
If they are connected to the dissimilar refrigerant cycle systems, a malfunction may occur.
WARNING:
Do not operate the system until all the check points have been cleared.
Pay attention to the following items while the system is running.
8. SAFETY AND CONTROL DEVICE SETTING
Model CH-6.0N1, CH-10.0N1