Hitachi Virtual Storage Platform
G200
Quick
Start
START
START
Prepare for
Installation
Connect the
Hardware
Power Up
the System
Enable Hi-Track
Remote Monitoring System
Run the Initial
Setup Wizard
Run the
Initial Startup
Wizard
Complete System
Setup
7
1
2
3
4
5
6
Quick
Start
Power, Fibre Channel,
iSCSI, and SAS
Cables (optional)
Software
Applications
Wrist
Strap
Storage
System
Bezel
Accessory
Box
1
Prepare for Installation
LIFTING HAZARD
CAUTION
Lift with 3 people.
1. Unpack package contents
Disk Drives
Power
Distribution
Units
1
Rack
User-Supplied
Rack (if not
ordered from
Hitachi)
Additional
Cables
Management
Console PC
(with NIC)
2. Provide these
items
3. Install devices into
the rack
Uninterruptible
Power Supply (UPS)
(optional)
Install the service processor (SVP)
at the top of the rack, and the
storage system and drive tray(s)
at the bottom.
SVP
Switch
Storage
System
Drive Tray
HDS or User-Supplied Rack
101.4 lbs.
(46 kg )
Hitachi Virtual Storage Platform
G200
Quick
Start
START
START
Prepare for
Installation
Connect the
Hardware
Power Up
the System
Enable Hi-Track
Remote Monitoring System
Run the Initial
Setup Wizard
Run the
Initial Startup
Wizard
Complete System
Setup
7
1
2
3
4
5
6