EasyManuals Logo

Hitachi ZAXIS 180-3 class User Manual

Hitachi ZAXIS 180-3 class
461 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #185 background imageLoading...
Page #185 background image
OPERATING THE MACHINE
5-36
1. Secure sling/chain tightly to the load being lifted. Wear
gloves when securing sling/chain.
2. Fasten sling/chain to bucket loop, with the bucket curled
and arm retracted.
3. Coordinate hand signals with your signal man before
starting.
4. Be aware of the location of all persons in the working
area.
5. Attach a hand line to load and make sure person holding
it is well away from load.
6. Before lifting, test your load.
• Park your machine close to load.
• Attach load to the machine.
• Raise load 50 mm above the ground.
• Swing the load all the way to one side.
• While keeping load close to the ground, move it away
from machine.
• If there is any indication of reduced stability of your ma
-
chine, lower load to the ground.
7. Lift load only as high as necessary.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hitachi ZAXIS 180-3 class and is the answer not in the manual?

Hitachi ZAXIS 180-3 class Specifications

General IconGeneral
BrandHitachi
ModelZAXIS 180-3 class
CategoryExcavators
LanguageEnglish

Related product manuals