EasyManua.ls Logo

Hoffmann Garant - 1 Installing an Upright Cabinet; Tools and Aids Required; Precondition; Requirements of the Installation Location

Default Icon
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The pull-out shelves are cantilevered, base-supported and equipped with an anti-
tilt device (only 1 frame can be pulled out at a time). The drawers can be controlled
using software to be ejected individually.
1. Installing an upright cabinet
1.1. Tools and aids required
Stepladder
Hexagon socket, size 3 mm with extension and small ratchet
Hexagon L-wrench, size 4 mm
1.2. Precondition
All drawers are empty.
1.3. Requirements of the installation location
Upright cabinets place increased demands on the subsurface in
particular, since the drawers run directly on the floor!
Flatness tolerance for finished floors as per DIN 18202.
Angularity of a maximum of two millimetres over the measurement
length of one metre.
Only place on ground that is absolutely level.
The subsurface must have a sufficient load-bearing capacity.
DE
EN
10

Related product manuals