14 15
Operating Instructions
REMOVE CHASSIS (CONT.)
5. Rotate the detached faceplate to expose the backside of the front panel. Remove the control panel
screw and set aside the faceplate (FIG.5).
Screw
Reversed side of front panel
FIG.5
6. Remove the six screws from the cabinet.(There are two screws on the top, left and right.) (FIG.6)
FRONT
7. Hold the cabinet while pulling on the base handle to carefully remove the unit. Do not pull or lift
near the top of the unit (FIG.7)
FIG.7
Do not
pull or
lift in
this
area.
This may
result in
damage.
FRONT
Operating Instructions
Top Angle Rail and Side Bracket Installation
The top rail must be assembled prior to installing the air
conditioner in the window.
Tools Needed: Phillips Screw Driver
Top Rail Hardware QTY
5/16
Long
Hex-head
Screw
4
Top
Rail
1
Aaching the Top Rail to the Air Conditioner
1. Remove the air conditioner from the box and place on a
hard at surface.
2. Remove top rail from the bottom of the packaging material
as shown in FIG. A.
3. Secure the top rail to the unit with the 5/16” Screws as
shown in FIG. B.
4. Slide the “I” section of the window panel into the side
bracket of the cabinet (FIG.8a). Do this for both sides.
FIG.8a
NOTE:
For safety reasons, all 4
screws must be used to attach
the top rail.
Foam Gasket and Top
Angle Rail