EasyManua.ls Logo

Honeywell Home Y8150A1017/U User Manual

Honeywell Home Y8150A1017/U
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
PRODUCT DATA
68-0282-11
Y8150 Fresh Air Ventilation System,
W8150 Fresh Air Ventilation Control
APPLICATION
The Y8150 Fresh Air Ventilation System, W8150 Fresh Air
Ventilation Control provide fresh air to a home. The control
operates a fresh air intake damper and, when necessary,
activates the main HVAC blower to efficiently meet
ASHRAE ventilation rates.
FEATURES
Designed to help meet local ventilation codes and
standards, including ASHRAE 62.2-2010 standard,
“Ventilation and Acceptable Indoor Air Quality in
Low-Rise Residential Buildings.”
Microcontroller optimizes the air delivery schedule to
make efficient use of normal HVAC run times.
Easy-to-use input dials allow customized ventilation
for each installation.
Test mode that includes immediate feedback to
installer to confirm that air delivery requirements of
selected ventilation standard are being met.
Economical supply-only ventilation; works with
forced air system.
Can be used with other equipment, such as an
HRV/ERV, for balanced ventilation.
IMPORTANT
Please read these instructions and keep them in
your records.

Questions and Answers:

Honeywell Home Y8150A1017/U Specifications

General IconGeneral
BrandHoneywell Home
ModelY8150A1017/U
CategoryFan
LanguageEnglish

Summary

W8150 Quick Guide

Installation Guidance

Installation Procedures

Installing Damper, Ducting, and Control

Details the physical steps for installing the fresh air damper, ducting, and mounting the control and transformer.

Wiring the Control

Provides instructions and diagrams for wiring the W8150 control, emphasizing electrical safety precautions.

Measuring and Setting Controls

Measuring Airflow

Step-by-step guide on how to measure ventilation airflow using the control's test mode and appropriate instruments.

Setting the Control

Dial Configuration and Recording

Guides on setting ventilation dials, observing indicator lights, and recording final settings on the device label.

System Checkout and Troubleshooting

Checkout Procedure

Steps to verify the proper operation of the ventilation system after installation and initial setup.

Troubleshooting Common Issues

Identifies common problems such as flashing lights, no power, or improper damper operation and their solutions.

Wiring Diagrams

Related product manuals