393691 LP GAS AND 394588 NATURAL GAS CONVERSION KITS
Automation and Control Solutions
Honeywell International Inc.
1985 Douglas Drive North
Golden Valley, MN 55422
customer.honeywell.com
® U.S. Registered Trademark
© 2016 Honeywell International Inc.
69-0244EF—01 M.S. 11-16
Printed in U.S.A.
8. Turn gas supply back on to other appliances
and relight all pilot flames according to
appliance manufacturer instructions.
9. Proceed to Checkout section.
Table 1. Converting Gas Flow Rate.*
CHECKOUT
1. Make certain the primary air supply to the main
burner is properly adjusted for complete
combustion at final pressure regulator setting.
Main burner must light reliably under all
conditions.
2. Place system in operation and observe through
at least one complete cycle to assure all con-
trols are operating properly.
3.
If manometer (pressure gauge) method is used,
perform Gas Leak Test at outlet pressure tap plug.
4. Apply the conversion label in the conversion kit
to the gas control, heating appliance, and any
other controls to show conversion to a new type
of gas.
Time (sec) Flow (cfh) Flow (m
3
/hr)
40 90 2.55
41 88 2.50
42 86 2.44
43 84 2.38
44 82 2.32
45 80 2.27
46 78 2.21
47 77 2.18
48 75 2.12
49 73 2.07
50 72 2.04
51 71 2.01
52 69 1.95
53 68 1.93
54 67 1.90
55 65 1.84
56 64 1.81
57 63 1.78
58 62 1.76
59 61 1.73
60 60 1.70
62 58 1.64
64 56 1.59
66 54 1.53
68 53 1.50
70 51 1.44
72 50 1.42
74 49 1.39
76 47 1.33
78 46 1.30
80 45 1.27
84 43 1.22
88 41 1.16
92 39 1.10
96 38 1.08
100 36 1.02
105 34 0.96
110 33 0.93
115 31 0.88
120 30 0.85
125 29 0.82
130 28 0.79
135 27 0.76
140 26 0.74
150 24 0.68
160 23 0.65
170 21 0.59
180 20 0.57
Time (sec) Flow (cfh) Flow (m
3
/hr)