Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Tzan.uen-tung
NPSU-PPE
Auditor :
Tzan.uen-tung
1. Loosen M/B Screw * 5 , Dissemble MB,Fig.1
2. Dissemble power button sponge, Disassemble power button,Fig.2
3. Dissemble volume board& volume button,Fig.3
6(1/1)
Electric torx screw driver(#1) 1
DIS MB & power button/volume button
1
2
3
5
Fig.1
4
Fig.2
sponge
Power button
Fig.3
Volume button
Volume board
2017/7/22
1.00