Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Tzan.uen-tung
NPSU-PPE
Auditor :
Tzan.uen-tung
1. Disassemble Thermal & Fan Screw *6, Disassemble FANCNTR,
Disassemble thermal(Fig.1/2/3)
2. Disassemble speaker cable mylar,Fig.4
DIS thermal& mylar
7(1/1)
Electric torx screw driver(#0) 1
Fig.1
Fig.2
5
6
Fig.3
1
2
3
4
FAN CNTR
Fig.4
2017/7/22
1.00