Standard Operation Procedure
Document No. Oldman FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Tzan.Uen-tung
NPSU-PPE
Auditor :
Tzan.Uen-tung
1. Loosen Speaker Screws *2,Fig1/2
2. Disassemble Speaker CNTR, Disassemble Speaker,Fig3
Disassemble speaker
10(1/1)
Fig1
Fig2
2016/12/05
1.00
speaker
CNTR
Fig4
Fig3
Electric cross screwdriver #1 1