Standard Operation Procedure
Document No. Oldman FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Tzan.Uen-tung
NPSU-PPE
Auditor :
Tzan.Uen-tung
1. Loosen M/B Screws *7 (Fig1/2)
2. Disassemble M/B
Disassemble M/B
11(1/1)
Fig1
1
2
3
4
5
2
1
Fig2
2016/12/05
1.00
Electric cross screwdriver #1 1