Standard Operation Procedure
Document No. Oldman FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Tzan.Uen-tung
NPSU-PPE
Auditor :
Tzan.Uen-tung
1.Loosen Thermal sensor/B Screws * 4(Fig1)
2.Disassemble thermal sensor FFC CNTR
3.Disassemble FFC
4.Disassemble thermal sensor/B(Fig2)
Disassemble thermal sensor/B
12(1/1)
Fig1
1
2
3
4
Fig2
2016/12/05
1.00
Electric cross screwdriver #1 1