Standard Operation Procedure
Document No. Oldman FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Tzan.Uen-tung
NPSU-PPE
Auditor :
Tzan.Uen-tung
Disassemble BTCB
1. Loosen BTCB Screws * 5
2. Disassemble BTCB
1(1/1)
Electric cross screwdriver T5 1
Fig1
1
2
3
4
5
2016/12/05
1.00