Standard Operation Procedure 
Document No.  Oldman FA  DIS ASS’Y SOP     Station  : 
Name  :                       Ver. :      Date  : 
Step: 
Notes : If finding anything uncommon, notice foreman or assistant at once. 
Holding fixture list (holding fixture standard) 
Qty 
Holding fixture list (holding fixture standard) 
Qty 
Tabulator: 
Issue department: 
Tzan.Uen-tung 
NPSU-PPE 
Auditor : 
Tzan.Uen-tung 
1. Disassmble battery cable CNTR  
2. Disassmble  M/B mylar 
3. Disassmble Wlan mylar 
2(1/1) 
Disassemble Battery CNTR &mylar 
Fig1 
Fig2 
Fig3 
2016/12/05 
1.00