Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared : Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty
Symbol
Issued:
IE department
Safe
Order
Hear
Look
Do
Static
Qual
ity
Fixtur
e
19(1/1)
1. Remove M/B
screwM2.0*2.0(6052B0388301)*2
(picture1)
❖ Torque:1.5 ± 0.2 kgf.cm
❖ screw can not be slipped.
2. Remove speaker cable CNTR(picture2)
3. Remove MB(picture3)
Disassemble MB
1.00
2020/3/21
picture2
picture1
1
2
picture3
Screw driver(#1) 1
Main Board