Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared : Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty
Symbol
Issued:
IE department
Safe
Order
Hear
Look
Do
Static
Qual
ity
Fixtur
e
Disassemble Smartcard/B or Dummy
20(1/1)
For Smart Card SKU (picture1)
1. Remove screw M2.0*2.0*D5
(6052B0388301)*3
❖ Torque:1.5 ± 0.2 kgf.cm
❖ screw can not be slipped.
2. Remove Smart Card/B (1397B0293701)
For Dummy Smart Card SKU
1. Tear off the copper stuck to C part
(picture2)
2. Rip the Dummy Smart Card
(6051B1360001)up and take it out
(picture3)
picture1
3
2
1
picture2
1.00
2020/3/21
picture3
picture4
Off the steel bath
撕掉铜箔
Screw driver(#1) 1