Standard Operation Procedure
step:
Document No. : Oleander Disassemble SOP Station :
Operation Name : Ver. : Edit date :
Prepared : Zhou.gui-ling
Notice: Please inform production line leader or master if you found any abnormal..
Fixture list (Spec.) Qty
Symbol
Issued:
IE department
Safe
Order
Hear
Look
Do
Static
Qual
ity
Fixtur
e
21(1/1)
1.00
2020/3/21
picture1
picture2
picture3
For FPR Module
1. Remove screw M2.0*1.5 D4
(6052B0324501) *1
❖ Torque:1.5 ± 0.2 kgf.cm
❖ screw can not be slipped.
2. Remove FPR Bracket(6053B1742401)
For Dummy FPR
1. Remove screw M2.0*1.5 D4
(6052B0324501) *1
❖ Torque:1.5 ± 0.2 kgf.cm
❖ screw can not be slipped.
2. Remove Dummy FRP(6051B1358301)
重点站
Disassemble Finger Print and Dummy
Screw driver(#1) 1