EasyManua.ls Logo

HP MSR930 3G - Pre-Installation Checklist

HP MSR930 3G
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
Item Re
q
uirements
Y
es No
Lightning protection
• The grounding cable of the chassis is grounded
properly.
• The grounding terminal of the AC power receptacle is
grounded properly.
• A port lightning arrester is installed. (Optional.)
• A power lightning arrester is installed. (Optional.)
• A signal lightning arrester is installed at the input end
of an external signal cable. (Optional.)
Electricity safety
• Install a UPS.
• In case of emergency during operation, switch off the
external power switch.
Workbench
• The workbench is stable.
• The workbench is grounded properly.
Safety
precautions
• The router is far away from any sources of heat or moisture.
• The emergency power switch in the equipment room is identified and
accessible.
Tools
• Installation accessories supplied with the router are ready.
• User-supplied tools are ready.
Reference
• Documents shipped with the router are available.
• Online documents are available.