Standard Operation Procedure
Document No. : NAIROBI FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
::
:
Disassemble BTCB
15(1/1)
0.1
2012/10/30
1. Disassemble the BTCB.
2. Must be sure there is a pad on the north
bridge, then attach a release paper to it.
(Fig.2)
3. Put the BTCB in material box.
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator: Issue department:
Alicia Chien
NPSU-SE
Fig.2