EasyManua.ls Logo

HP mt40

HP mt40
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Standard Operation Procedure
Document No. : NAIROBI FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step
Disassemble BTCB
15(1/1)
0.1
2012/10/30
1. Disassemble the BTCB.
2. Must be sure there is a pad on the north
bridge, then attach a release paper to it.
(Fig.2)
3. Put the BTCB in material box.
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator Issue department
Alicia Chien
NPSU-SE
Fig.2

Related product manuals