Standard Operation Procedure
Document No. : NAIROBI FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
::
:
1. Loosen M/B screw * 3. (Fig.1)
2. Take out the RTC battery from routing rib.
(Fig.2)
Loosen M/B Screws
20(1/1)
0.1
2012/10/30
1
2
3
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator: Issue department:
Alicia Chien
NPSU-SE
Fig.2
Electric cross screwdriver (1#) 1