EasyManua.ls Logo

HP mt40

HP mt40
28 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Standard Operation Procedure
Document No. : NAIROBI FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step
Inspect BTCB
1. Inspect the BTCB.
Check the button. (Fig.1)
Check the bracket. (Fig.2)
Check the thermal pad. (Fig.3)
26(1/1)
0.1
2012/10/30
NO HOT MELT NG
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator Issue department
Alicia Chien
NPSU-SE
Fig.2
Fig.3

Related product manuals