Standard Operation Procedure
Document No. : NAIROBI FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
::
:
Disassemble Thermal
7(1/1)
0.1
2012/10/30
1
2
3
4
Intel DIS
6
5
1. Loosen thermal screw *6.
2. Remove the thermal.
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator: Issue department:
Alicia Chien
NPSU-SE
Electric cross screwdriver (1#) 1