EasyManua.ls Logo

HP ProCurve 3500 - Page 43

HP ProCurve 3500
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-7
Installing the Switch
Installation Procedures
Installing the Switch
Figure 2-4. LEDs on the HP ProCurve 6200yl-24G switch.
When the switch is powered on, it performs its diagnostic self test. Self
test takes approximately 50 seconds to complete.
LED Behavior:
During the self test:
Initially, all the status, LED Mode and port LEDs are on for most of
the duration of the test.
Most of the LEDs go off and then may come on again during phases
of the self test. For the duration of the self test, the Test LED stays on.
When the self test completes successfully:
•The Power and Fan Status LEDs remain on.
•The Fault and Test LEDs go off.
The port LEDs on the front of the switch go into their normal
operational mode:
If the ports are connected to active network devices, the LEDs
behave according to the LED Mode selected. In the default view
mode (Link), the LEDs should be on.
If the ports are not connected to active network devices, the LEDs
will stay off.
If the LED display is different than what is described above, especially if the
Fault and Test LEDs stay on for more than 60 seconds or they start blinking, the
self test has not completed correctly. Refer to chapter 5, “Troubleshooting”
for diagnostic help.
Fault
Power
Locator
Switch port LEDs
Test LED
Power and
Fault LEDs

Related product manuals