EasyManua.ls Logo

HP ProLiant ML350e Gen8 - Page 79

HP ProLiant ML350e Gen8
150 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware options installation 79
8.
Install the SFF hard drive cage.
9. Using the T-15 screws, secure the hard drive cage to the server.
10. If installed, remove the PCI air baffle (on page 28).
11. Remove the system air baffle (on page 30).
12. Remove any installed full-length PCI cards.
13. Remove the fan cage (on page 31).

Other manuals for HP ProLiant ML350e Gen8

Related product manuals