Hardware options installation 91
11. Install the PCI air baffle into the server ("Install the PCI air baffle" on page 29).
12. Install the access panel (on page 26).
13. Do one of the following:
o For tower models, return the server to an upright position.
o For rack models, install the server onto the rails.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.
17. Do one of the following:
o For tower models, install the bezel ("Install the rack bezel" on page 25).
o For rack models, if removed, install the security bezel ("Security bezel option" on page 47).
LFF 5/6 drive cable option
1. Do one of the following:
o For tower models, open and remove the bezel ("Remove the tower bezel" on page 22).
o For rack models, if installed, remove the security bezel (on page 24).
2. Power down the server (on page 22).
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Do one of the following:
o For tower models, place the server on a flat, level surface with the access panel facing up.
o For rack models, extend the server from the rack (on page 27).