Scenario 2 Connecting front-end ports to the application server through switches
Network cable connection
Optical fiber cable connection
18
Application server
Controller
enclosure
Fibre Channel
switch
Fibre Channel
switch
Ethernet switch
Ethernet switch
Application server
Controller
enclosure
Installing a high-speed cable Removing a high-speed cable
Insert the connector. After hearing a click, pull the
cable slightly. If the cable is not pulled out, the
connector is secured.
Push the connector slightly and pull the buckle as
shown in the figure to remove the high-speed cable.
Connect and remove high-speed cables as shown in the following figures.