12
1 Installation Holes for the Subrack
1
2
82
83
Scenario Component Installation Holes Remarks
2 x T32
subracks
(One
electrical
subrack at
most)
PDU 81, 83 -
T32 44, 46, 58, 59, 74, 76
If only one T32
subrack needs to
be installed,
install the subrack
in the top-most
area of the
cabinet. Note that
the cabinet must
stand vertically
after the subrack
is installed.
T32 7, 9, 21, 22, 37, 39
DCM 1, 2 -
2 x T32
electrical
subracks
PDU 81, 83 -
T32 77, 75, 60, 59, 47, 45 -
Air deflector 40, 39 -
T32 37, 35, 20, 19, 7, 5 -
1 x T32
subrack +
2 x 6800
subracks
PDU 81, 83 -
T32
44, 46, 58, 59, 74,
76
-
6800 subrack 24, 25, 38, 39 -
6800 subrack 8, 9, 22, 23 -
DCM 1, 2, and 3, 4 -
1 x T32
subrack +
2 x T16
subracks
PDU 81, 83 -
T32
45, 47, 59, 60, 75,
77
-
T16 subrack 24, 25, 38, 40 -
T16 subrack 6, 7, 20, 22 -
DCM 1, 2 -
1 x T32
subrack +
2 x
universal
platform
subracks
PDU 81, 83 -
T32
44, 46, 58, 59, 75,
76
-
Universal
platform
subrack
24,25,38,39 -
Universal
platform
subrack
8,9,22,23 -
DCM 1, 2, and 3, 4 -
Deploying T32 Subracks or T32 and Other Subracks in the Same N63B Cabinet
b
The installation holes on an N63B cabinet are numbered 1 to 83 from bottom to top.
Installation holes on an N63B cabinet
Front side of an N63B cabinet

Related product manuals