Scenario Component Installation Holes
4 x T16
subracks
PDU 81, 83
T16 subrack 61, 62, 75, 77
T16 subrack 43, 44, 57, 59
T16 subrack 24, 25, 38, 40
T16 subrack 6, 7, 20, 22
DCM 1, 2
3 x T16
subracks +
1 x 6800
subrack
PDU 81, 83
T16 subrack 62, 63, 76, 78
T16 subrack 44, 45, 58, 60
T16 subrack 24, 25, 38, 40
6800 subrack 7, 8, 21, 22
DCM 1, 2, and 3, 4
2 x T16
subracks +
2 x 6800
subracks
PDU 81, 83
T16 subrack 61, 62, 75, 77
T16 subrack 43, 44, 57, 59
6800 subrack 24, 25, 38, 39
6800 subrack 8, 9, 22, 23
DCM 1, 2, and 3, 4
1 x T16
subrack + 3
x 6800
subracks
PDU 81, 83
T16 subrack 61, 62, 75, 77
6800 subrack 42, 43, 56, 57
6800 subrack 24, 25, 38, 39
6800 subrack 8, 9, 22, 23
DCM 1, 2, and 3, 4
14
Deploying T16 Subracks or T16 and Other Subracks in the Same N63B Cabinet
c
1 Installation Holes for the Subrack
The installation holes on an N63B cabinet are numbered 1 to 83 from bottom to top.
Installation holes on an N63B cabinet
Front side of an N63B cabinet