82
9 Installing and Routing Subrack Power Cables
T32 Subrack
b
NOTE
Cable tie
Diagonal pliers
Route the main power cables to the left side of the cabinet and the backup power cables to the right side of the
cabinet.
T32
When power cables are preinstalled on subracks
For a T32 subrack delivered with a cabinet, the
subrack is pre-equipped with power cables and is
preinstalled in the cabinet.