4 Installing Power Cables Between the DPD63-8-8 PDU and PDF
DPD63-8-8 PDU Introduction
a
Power switch
area (A)
Power switch
area (B)
DC PDU (with the front panel installed)
Determine whether copper fittings need to be installed in the power input areas based on the site survey result.
Remove the front panel of the DC PDU prior to installing power cables. After installing the power cables, restore
the cover of the DC PDU to the original position.
NOTE
Do not install any copper fitting in the power output areas of the DC PDU. If copper fittings are required, install
them only in the power input areas of the DC PDU.
DANGER
DC PDU (with the front panel removed)
A1
(+)
A2
(+)
A3
(+)
A4
(+)
B1
(+)
B2
(+)
B3
(+)
B4
(+)
A1
(-)
A2
(-)
A3
(-)
A4
(-)
B1
(-)
B2
(-)
B3
(-)
B4
(-)
Power input area
(B)
Power output area (B) Power output area (A)
Power input area
(A)
DC PDU (with copper fittings installed)
Two-in-one copper fitting (left)
NEG (-)
Two-in-one copper fitting (right)
NEG (-)
Two-in-one copper fitting (middle)
RTN (+)