EasyManua.ls Logo

Huawei OptiX OSN 8800 T64 - Page 89

Huawei OptiX OSN 8800 T64
139 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
86
T16
T16
9 Installing and Routing Subrack Power Cables
T16 Subrack
c
M3
2# screwdriver
0.39 ± 0.04 N.M
M6
3# screwdriver
4.90 ± 0.49 N.M
M3
2# screwdriver
0.39 ± 0.04 N.M
When power cables are preinstalled on subracks or on the left and right sides of a cabinet
1. When a T16 subrack is delivered with a cabinet, the subrack is pre-equipped with power cables and the
power cables are routed to the left and right sides of the cabinet.
2. When a T16 subrack needs to be installed on site, the power cables are preinstalled on its left and right
sides of the cabinet regardless of whether the T16 subrack is co-resident with universal platform subracks or
is deployed alone.
NOTE
Route the power cables to the subracks
through the holds on the left or right side of
the cabinet and bundle them horizontally.
The power cables cannot block the EFI
board.
NOTE
Main
Backup
Main
Backup

Related product manuals