EasyManua.ls Logo

Huawei OptiX OSN 8800 T64 - Page 92

Huawei OptiX OSN 8800 T64
139 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
89
RTN(+)
NEG(-)
9 Installing and Routing Subrack Power Cables
Universal Platform Subrack
d
Do not install or remove power cables while the equipment is
powered on. Ensure that the power is switched off prior to removing
or installing a power cable to avoid bodily injuries.
WARNING
Diagonal pliers
Cable tie
Phillips screwdriver
The protruding side of the two-hole OT terminals on power
cables faces outwards. Connect the OT terminal of the -48
V power cable (blue) to the PIU NEG(-) terminal and the
RTN cable (black) to the PIU RTN(+) terminal.
Remove the front panel of the PIU board.
Inner
side of
the PIU
Inner
side of
the PIU
M3
2# screwdriver
0.39 ± 0.04 N.M
M6
3# screwdriver
4.90 ± 0.49 N.M
When power cables are preinstalled on subracks or on the right side of a cabinet
1. When a universal platform subrack is delivered with a cabinet, the subrack is pre-equipped with power cables
and the power cables are routed to the right side of the cabinet.
2. When a universal platform subrack needs to be installed on site, the power cables are preinstalled on its right
side of the cabinet regardless of whether the universal platform subrack is co-resident with T32/T64 subracks or
is deployed alone.
NOTE

Related product manuals