EasyManua.ls Logo

Huawei OptiX OSN 9560 - Page 16

Huawei OptiX OSN 9560
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
Precautions for installing the DC power distribution box
Power input
area
Power output
area
M6 screw
Select M6 two-hole OT terminals that comply with the power cable specifications of the DC power
distribution box to prevent sparks during power-on.
M6 two-hole
terminal
A two-hole OT
terminal with
hole diameters
that do not meet
cable
specifications
Do not install short-circuit copper bars in the power output areas.
Setup of the onsite power supply determines whether short-circuit copper bars need to be installed in the
power input area.
Install OT terminals correctly by referring to the wiring terminal labels on the plastic cover of the DC power
distribution box.
CAUTION
CAUTION
DANGER

Related product manuals