No. Item Method
7 The card is installed and removed
easily. The screws on the panel should
be appropriately tightened and easily
disassembled. The spring wire is intact.
-
8 The cabinet surface must be tidy and
clean; the components of the cabinet
cannot be distorted; all identifiers are
correct, clear, and complete.
-
9 The cabinet is kept clean and there are
no excessive binding straps and other
articles in the cabinet.
-
10 The ESD wrist straps are connected the
ESD jack in the chassis.
11 Blank panels are installed in all empty
slots.
-
Cable Installation Checklist
Table 4-2 describes the cable installation checklist.
Table 4-2 Cable installation checklist
No.
Item Method
1 The power cables and ground cables must
be the copper wires and have no splice.
The cables are safely connected
complying with standards.
-
S3700&S5700&S6700 Series Ethernet Switches