Figure 7-6 Uploading the SN list
Step 3 After the device is connected, set the grid code based on the site requirements.
Figure 7-7 Setting the grid code
Step 4 Connect to power meters.
Set related parameters by referring to "Setting Meter Parameters" in the
SmartLogger3000 User Manual
.
Figure 7-8 Connecting to power meters
Step 5 Connect to EMIs.
SUN2000-(250KTL, 280KTL, 300KTL, 330KTL) Series
User Manual 7 Power-On and Commissioning
Issue 07 (2023-06-30) Copyright © Huawei Technologies Co., Ltd. 68