4 Installation and Cable Connection
4.1 Installation Preparations
Floor Loading Capacity
The oor must be able to bear the weight of the UPS and its optional
components. In the case of rack-mounted installation, ensure that the oor can
also bear the weight of the rack.
Installation Environment
● Do not install the UPS in a high-temperature, low-temperature, or damp place
that is beyond the technical specications.
● Keep the UPS far away from water, heat sources, and ammable and
explosive substances. Install the UPS in an environment free of dust, volatile
gas, salt, and corrosive materials. Avoid direct sunlight.
● Do not install the UPS in environments with conductive metal scraps in the
air.
● The optimal operating temperatures for batteries are 20–30°C. Operating
temperatures higher than 30°C shorten the battery lifespan, and operating
temperatures lower than 20°C reduce the battery backup time.
Installation Clearances
● Reserve a clearance of about 100 mm based on the UPS installation
dimensions for the input and output plugs on the rear backplane of the UPS.
● Reserve a clearance of at least 500 mm from the front and rear of the chassis.
UPS2000-A-(1 kVA-3 kVA)