EasyManua.ls Logo

Hubbell 180-2 User Manual

Hubbell 180-2
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTALLATION, OPERATION, AND
MAINTENANCE MANUAL FOR
THE HUBBELL TANKLESS WATER HEATER
ELECTRIC HEATER COMPANY
Edition 2016A
Question and Answer IconNeed help?

Do you have a question about the Hubbell 180-2 and is the answer not in the manual?

Hubbell 180-2 Specifications

General IconGeneral
BrandHubbell
Model180-2
CategoryWater Heater
LanguageEnglish

Summary

Important Safety Information

SECTION I – TANKLESS WATER HEATER OPERATING PRINCIPLE

SECTION II – GENERAL DESCRIPTION AND CONSTRUCTION

SECTION III – INSTALLATION

Locating and Mounting Instructions

Provides guidelines for choosing an installation location and safely mounting the unit.

Plumbing Installation Instructions

Outlines plumbing considerations, code compliance, T&P valves, pipe types, and connection procedures.

Flushing the Line

Explains flushing lines before connection to remove debris and prevent component damage.

Checking for Leaks and Purging Air

Instructs on checking for leaks and purging air before powering on to prevent heating element damage.

SECTION IV – OPERATION AND MAINTENANCE

Electrical Installation and Wiring

Covers electrical installation, wiring, circuit breaker sizing, and wire gauge for the unit.

First Use of the Water Heater

Guides through initial startup, powering on, and setting the desired output temperature.

Temperature Controller Interface

Explains using the digital display and buttons to adjust settings and access configuration menus.

SECTION V – TROUBLESHOOTING

Initial Evaluation and Basic Checks

Flowchart for initial troubleshooting: display, circuit breakers, crossover, temp setting, flow rate.

Advanced Electrical Troubleshooting

Troubleshooting steps for qualified electricians, focusing on power supply and hi-limit thermostats.

Checking Thermistor Resistance

Measures thermistor resistance against water temperature for accuracy verification.

Checking the Flow Meter

Tests flow meter voltage outputs to ensure correct operation and flow measurement.

Checking Temperature Controller and Triacs

Verifies voltage readings for the temperature controller and checks triac output to heating elements.

SECTION VI – SERVICING & REPLACEMENT OF PARTS

SECTION VIII – WARRANTY

Related product manuals