57A
4268057A
NONE
A HOOK UP SHORE POWER CABLE/S
CRANK ENGINE, OPEN BLEEDER VALVE (SEE PAGE 55B) UNTIL AIR IS GONE FROM LINES
NOTE: WHEN COOLANT IS INSTALLED, BLEED AIR FROM HEAT EXCHANGER LINES TO WATER HEATER.
BEFORE APPLYING POWER TO UNIT, TO AVOID DAMAGE TO HEATING ELEMENT
NOTE: AS WITH ALL WATER HEATERS, BE SURE THE UNIT IS FILLED WITH WATER
C TURN ON "WATER HEATER" BREAKER ON MAIN BREAKER PANEL
B TURN ON A.C. MAIN BREAKER ON MAIN BREAKER PANEL
9 TO HEAT BY "SHORE POWER"
8 TO HEAT BY "ENGINE" SEE PAGE 55A FOR ENGINE OPERATING INSTRUCTIONS.
B BY SUPPLYING 110V.A.C. BY "DOCKSIDE SHORE POWER".
A BY HEATING THE WATER THRU THE ENGINE HEAT EXCHANGER UNIT
7 "HOT WATER" IS ATTAINABLE BASICALLY IN TWO WAYS...
6 TURN ON "WATER PRESSURE" BREAKER ON MAIN BREAKER PANEL
5 TURN ON "D.C. MAIN" BREAKER ON MAIN BREAKER PANEL
(PANEL LOCATED AT THE NAV STATION)
4 TURN BATTERY SELECTOR SWITCH TO THE (1 , 2 OR BOTH) POSITION
2 OPEN ISOLATOR VALVE (SEE PAGE 57B FOR LOCATION)
1 FILL TANK WITH FRESH WATER (SEE PAGE 60B FOR FILL LOCATIONS)
FRESH WATER SYSTEM OPERATION:
"FLIP" MAIN PANEL BREAKERS @ BATTERY SWITCH TO THE "ON" POSITION
3 OPEN DESIRED MANIFOLD VALVES (SEE PAGE 57C)