EasyManua.ls Logo

Husqvarna 6010 User Manual

Husqvarna 6010
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Question and Answer IconNeed help?

Do you have a question about the Husqvarna 6010 and is the answer not in the manual?

Husqvarna 6010 Specifications

General IconGeneral
BrandHusqvarna
Model6010
CategorySewing Machine
LanguageEnglish

Summary

THREAD TENSION

Lower Thread Tension Adjustment

Details on adjusting the lower thread tension using the spring on the bobbin case.

UPPER THREAD TENSION

Upper Thread Tension Device

Explanation of the upper thread tension control, including the discs, spring, and washer.

MACHINE DRIVE AND SPEED REGULATION

SPEED CONTROL

Foot Control Speed Regulation

How the foot control adjusts speed via an electronic circuit and motor regulation.

PATTERN MECHANISM

Function of the Pattern Mechanism

Explanation of how the pattern mechanism controls needle position and feed direction.

BUTTONHOLE MECHANISM

Buttonhole Stitch Width

How the buttonhole mechanism and radial curves determine stitch width for buttonholes.

FOOT CONTROL

Foot Control Speed Requirements

Ensuring the foot control provides continuously controllable speed from slow to full.

LOWEST SPEED OF THE MOTOR

Lowest Speed Requirement

Ensuring the machine maintains a lowest speed of 100 rev/min.

SETTING THE UPPER STOP-RIGHT POSITION OF THE NEEDLE

Needle Stop-Right Position Requirements

Ensuring correct distance between stitch plate and needle tip when stopped.

Needle Stop-Right Position Adjustment

Steps to adjust the needle's upper stop-right position by moving the handwheel.

TIMING THE ZIGZAG MOVEMENT

Zigzag Movement Timing Requirement

Ensuring side movement of the needle is completed before the tip of the needle reaches the stitch plate.

Zigzag Movement Timing Adjustment

Adjusting handwheel and set screws to center the cam follower on the cam lobe.

NEEDLE TO HOOK CLEARANCE

Needle to Hook Clearance Requirements

Ensuring correct gap between needle and hook for thread loop formation.

Needle to Hook Clearance Adjustment

Adjusting needle bar by turning handwheel, removing screws, and setting the driver position.

SETTING THE UPPER THREAD TENSION

Upper Thread Tension Setting (Method 1)

Adjusting upper thread tension by separating tension discs and aligning indicators.

Upper Thread Tension Setting (Method 2)

Adjusting upper thread tension by checking needle parallelism and thread deflection.

SETTING THE THREAD TENSION OF THE BOBBIN CASE

Bobbin Case Tension Requirement

Ensuring the thread tension spring provides 20-24 grams resistance when pulling thread.

Bobbin Case Tension Adjustment

Adjusting bobbin case tension by turning the programmer and checking thread pull.

Related product manuals