4
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Reach-in Joining Instructions
P/N 0387177_K
4
If not already installed make
sure NutRetainers and
Alignment Pins are in place in
the right end frame as shown
in Figure 4A or 4B.
Figure 4A. Verify Nut Retainer Installation
RLT
RL / RM / RMF
and
RLN / RMN
Alignment Pin