EX 700 - Convert to NG fuel (P-Kit 1200)
| 7
Completing and affixing the conversion labels
1. Fillintheconversionlabels(includedinthekit)associatedwiththenewfueltype.
2. PlacetheconversionlabelsontotheboileratthepositionsindicatedonWhere to place conversion labels on
the boiler on page 8.
Clocking the meter (Natural Gas)
1. Turnoffallotherappliancesandpilots.
2. Turnontheboilerandsettheboilertohighfire.
3. Ensuretheboilerhasalargeloadtoheat,sothattheboilerwillnotshutoff.
4. WithaStop-Watch,recordthenumberofsecondsforthesmallestdialtomake1fullrevolution.
5. CFH=(3600xDialSize)/Seconds.
6. CFHx1000(checklocalBtucontent)=InputBtu’s.
Note
For2PSImetersmultiplyCFHx1.097
ForMetricmetersmultiplyCFHx35.3
For2PSImetricmetersmultiplyCFHx1.097x35.3
ForAltitudeabove4,500’deduct2%per1,000’ofaltitudefromtheInputBtu’s.