EasyManua.ls Logo

IBC HC Series User Manual

IBC HC Series
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTALLATION AND OPERATING INSTRUCTIONS
www.ibcboiler.com
HC Series Boilers
HC 13-50, HC 23-84, HC 29-106, HC 20-125, HC 33-160
(Natural Gas or Propane)
WARNING: If the information in this manual is not followed exactly, a re or
explosion may result causing property damage, personal injury, or loss of life.
Do not store or use gasoline or other ammable vapours and liquids or other
combustible materials in the vicinity of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS:
Do not try to light any appliance.
Do not touch any electrical switch; do not use any phone in your building.
Immediately call your gas supplier from a nearby phone. Follow the gas
suppliers instructions.
If you cannot reach your gas supplier, call the re department.
Installation and service must be performed by a qualied installer, service
agency or the gas supplier.
This Manual is also available in French - contact IBC or visit our web site www.ibcboiler.com
Question and Answer IconNeed help?

Do you have a question about the IBC HC Series and is the answer not in the manual?

IBC HC Series Specifications

General IconGeneral
Heat Exchanger MaterialStainless Steel
Installation TypeWall-mounted
TypeCondensing
Fuel TypeNatural Gas or Propane
EfficiencyUp to 95%
Ignition TypeElectronic
Vent Diameter2 - 3 inches
DimensionsVaries by model

Summary

SAFETY CONSIDERATIONS

INSTALLATION

EXHAUST VENTING AND AIR INTAKE

Planning for proper vent materials, travel, and termination for safe operation.

CONDENSATE REMOVAL

Procedures for safe drainage and neutralization of boiler condensate.

GAS PIPING

Guidelines for safe and compliant natural gas or propane piping installation.

ELECTRICAL CONNECTIONS

Procedures for safe and correct wiring of the boiler and its components.

STARTUP AND COMMISSIONING

LIGHTING AND SHUTTING DOWN THE BOILER

Safety instructions and procedures for starting and stopping the boiler.

PRIOR TO START-UP

Essential pre-ignition checks, including trap fill and gas pressure verification.

COMMISSIONING

Procedures for verifying proper operation and making necessary adjustments.

FUEL CONVERSION

FUEL CONVERSION

Steps for converting the boiler from natural gas to propane and vice-versa.

MAINTENANCE

TROUBLESHOOTING

Related product manuals