EasyManua.ls Logo

IBC HC 33-160

Default Icon
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
INSTALLATION AND OPERATING INSTRUCTIONS
www.ibcboiler.com
HC Series Boilers
HC 13-50, HC 23-84, HC 29-106, HC 33-124, HC 20-125, HC 33-160
(Natural Gas or Propane)
WARNING: If the information in this manual is not followed exactly, a re or
explosion may result causing property damage, personal injury, or loss of life.
Do not store or use gasoline or other ammable vapours and liquids or other
combustible materials in the vicinity of this or any other appliance.
WHAT TO DO IF YOU SMELL GAS:
Do not try to light any appliance.
Do not touch any electrical switch; do not use any phone in your building.
Immediately call your gas supplier from a nearby phone. Follow the gas
suppliers instructions.
If you cannot reach your gas supplier, call the re department.
Installation and service must be performed by a qualied installer, service
agency or the gas supplier.
This Manual is also available in French - contact IBC or visit our web site www.ibcboiler.com
Question and Answer IconNeed help?

Do you have a question about the IBC HC 33-160 and is the answer not in the manual?

IBC HC 33-160 Specifications

General IconGeneral
BrandIBC
ModelHC 33-160
CategoryBoiler
LanguageEnglish

Summary

Installation

Exhaust Venting and Air Intake

Planning and execution of proper exhaust venting and air intake systems.

Gas Piping

Requirements and guidelines for safe and adequate gas supply piping.

Electrical Connections

Procedures for connecting power supply and control wiring.

Boiler Systems and Operation

Sequence of Operation

Step-by-step process of boiler operation modes and functions.

Startup and Commissioning

Commissioning

Procedures for adjusting and verifying proper operation after installation.

Fuel Conversion

Steps for converting the boiler between natural gas and propane.

Troubleshooting

Related product manuals