Fuel Type | Natural Gas or Propane |
---|---|
Efficiency | Up to 95% AFUE |
Heat Exchanger Material | Stainless Steel |
Boiler Type | Condensing |
Ignition Type | Electronic |
Control System | Advanced electronic control with outdoor reset |
Vent Type | Direct Vent |
Venting | PVC, CPVC |
List of tools and manuals required for boiler commissioning.
Preliminary steps before commencing boiler commissioning procedures.
Document the type of gas and all relevant gas pressure readings.
Configure boiler settings to Manual mode, set maximum supply and heat output.
Verify the flame current (mA) at high and low fire settings.
Perform tests to ensure proper gas pressure regulation and lock-up.
Fine-tune low fire flame current using the zero-offset adjustment screw.
Restore the boiler's load type to its original setting after commissioning.
Review configuration and ensure maximum temperature meets load requirements.