EasyManua.ls Logo

IBM 9406-520

IBM 9406-520
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.3
From the back of the rack, use the pin to affix the cable-management arm to
the left slide-rail-management arm flange that is attached to the rack frame .
AE
D
6.1
Locate the cable-management arm and the two pins .EA
6.2
Use the second pin to affix the other end of the cable-management arm to the flange
that is attached to the sliding portion of the left slide rail assembly .
A E
CB
6
Install the cable-management arm
B
C
D
E
A
Tip: If space is limited inside the rack, slide the server out part of the way to install the
cable-management arm.

Other manuals for IBM 9406-520

Related product manuals