EasyManuals Logo
Home>IBM>Server>Power System 5148-21L

IBM Power System 5148-21L User Manual

IBM Power System 5148-21L
204 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
6. If you are installing more than one drive, repeat the steps in this procedure until all drives are
installed.
Preparing the expanded function 5148-21L, 5148-22L, 8247-21L, 8247-22L, 8284-21A, or 8284-22A system
for operation after installing a solid-state drive with the power turned off:
Learn to prepare the system for operation after you install a solid-state drive (SSD) in the system, with
the system power turned off.
To prepare the system for operation, complete the following steps:
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is
connected to an unpainted metal surface. If not, do so now.
2. Reconnect the power cords to the system. For instructions, see “Connecting the power cords to the
system” on page 145.
3. If applicable, cover the SSD cage with the perforated plate (A) as shown in Figure 9 on page 13.
P8HAL507-2
A
Figure 8. Installing an SSD in an expanded function 5148-21L, 5148-22L, 8247-21L, 8247-22L, 8284-21A, or
8284-22A system
12 Disk drives or solid-state drives

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Power System 5148-21L and is the answer not in the manual?

IBM Power System 5148-21L Specifications

General IconGeneral
BrandIBM
ModelPower System 5148-21L
CategoryServer
LanguageEnglish

Related product manuals