EasyManua.ls Logo

IBM Power System L922

IBM Power System L922
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 8. Installing the service access cover
4. Unlock the blue rail safety latches (A) by pushing them inward.
Ensure that the cable management arms can move freely. Ensure that the cables at the rear of the
unit do not catch or bind as you push the unit into the operating position.
Trusted platform module card for the 5105-22E, 9008-22L, 9009-22A, 9009-22G, 9223-22H, or 9223-22S
11

Related product manuals