EasyManua.ls Logo

IBM SCM - Page 10

IBM SCM
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
c. Label the SMP cables so they may be plugged back into the same slots.
d. Grip the pull tab and pull in the direction indicated to remove the SMP cables.
9. Remove all clock card cables
a. Make note of the location from which each clock card cable is removed. They must be plugged
into the same location when reinstalled.
6 Power Systems: SCM

Related product manuals