EasyManua.ls Logo

IBM SCM - Page 14

IBM SCM
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Note: Some pictures in the procedure from this step onward show the node on slide rails. This
should be ignored because the system has been removed from the rails and is positioned on the
lift tool.
14. Remove Top Cover
Note: The following steps apply only to the system node being serviced.
a. Lift up the cover latch.
b. Lift the cover off the system.
10 Power Systems: SCM

Related product manuals