c. Remove ServerLIFT Tool.
15. If removed earlier, install the 2 retention screws (A) at the back of the system.
16. Install clock card cables
a. Note: The clock flex cables are point to point cables designed for their fixed locations and
should not be stretched when installing. Stretching the cable during installation may lead to
misplugging and bent pins.
Install SCM 31